C: Construction Update for week of Oct. 17, 2022

LOCATIONS

Bliss Avenue
None

Lassen Court
None

Miles Avenue
None

Monroe Street
None

Palm Street
None

Rubidoux Street
None

Sierra Avenue
None

Sun Gold Street
None

PLANNED WORK

The following construction activities are planned in this stage at or near the locations above. 

  • Tree/stump removals
  • Irrigation work
  • Utility potholing
  • Pre-construction activities

DRIVEWAY RECONSTRUCTION

During driveway reconstruction residents may not drive on, or park in, the driveway for up to 12 days, which may only include one weekend. PLEASE PARK ACROSS THE STREET. Crews will demolish, grade, form, and place concrete, this is a moving operation. Sidewalk construction begins where driveways are complete.

After new concrete is placed, residents may not walk on driveway or sidewalk for 24 hours and may not park on driveway for 72 hours.

Saw cutting work prepares for driveway demolition, excavation, and reconstruction. Affected residents can expect large machinery, loud noises and dust during working hours. 

VEGETATON REMOVAL

Vegetation clearing continues. Please remove any plants or shrubs in the marked project area that you would like to save. 

POTHOLING

Potholing, where crews cut holes in the ground/street to investigate what’s underground. This is a moving operation, please watch for crews working in the street. 

WATER METER & FIRE HYDRANT RELOCATIONS

Water service may be disrupted for up to 3 – 5 hours once your water is shut off. Residents will receive a door hanger with the date and instruction for the planned disruption.

TREE REMOVAL

Crews continue large tree and stump removals throughout the project area. The outreach team has left flyers at affected residences. Please remove any plants that you would like to save within a 6-foot radius of large trees and or stumps that are marked with bright orange dots or an x.

Leave a Comment

You must be logged in to post a comment.