B: Construction Update for week of Oct. 24, 2022
LOCATIONS
Monroe Street
None
Rubidoux Street
Water service disruption will occur on your street at the listed addresses through Oct. 28. Schedules may vary from flyer due to field conditions. The following resident received a door hanger with the date of the planned disruption:
44731
San Jacinto Avenue
Water service disruption will occur on your street at the listed addresses through Oct. 28. Schedules may vary from flyer due to field conditions. The following resident received a door hanger with the date of the planned disruption:
82109, 82123, 82205, 82211, 82217, 82223, 82249, 82265, 82311, 82325, 82335, 82339
Santa Rosa Avenue
None
Sun Gold Street
None
PLANNED WORK
The following construction activities are planned in this stage at or near the locations above.
- Water meter relocation
- Irrigation work
- Parking restrictions
- Utility potholing
- Limited pedestrian access
- Pre-construction activities
WATER METER & FIRE HYDRANT RELOCATIONS
Water service may be disrupted for up to 3 – 5 hours once your water is shut off. Residents will receive a door hanger with the date and instruction for the planned disruption.
DRIVEWAY RECONSTRUCTION
During driveway reconstruction residents may not drive on, or park in the driveway for up to 12 days, which may only include one weekend. PLEASE PARK ACROSS THE STREET. Crews will demolish, excavate, grade, form, place concrete, cure, remove forms, and then backfill, this is a moving operation. Sidewalk construction begins where driveways are complete.
After NEW concrete is placed, residents may NOT walk on driveway or sidewalk for 24 hours and may NOT drive or park on driveway for 72 hours.
Saw cutting work prepares for driveway demolition, excavation, and reconstruction. Affected residents can expect large machinery, loud noises and dust during working hours.
VEGETATON REMOVAL
Vegetation clearing continues. Please remove any plants or shrubs in the marked project area that you would like to save.
POTHOLING
Potholing, where crews cut holes in the ground/street to investigate what’s underground. This is a moving operation, please watch for crews working in the street.